B KELLY CONSTRUCTION COMPANY INC
Verified against state license rosterSeptic Installation · Septic System Repair
- Phone
- 931-808-9941
- Website
- none
Bedford County
Listed by where the business is, not by who it says it serves. Every operator here holds a current state permit, and the address it is placed by comes from the state's own published list — so this is a checkable claim rather than a service-area promise. A Tennessee installer permit is valid statewide, so operators further out can work here too; these are simply the ones closest to you.
Septic Installation · Septic System Repair
Septic Installation · Septic System Repair
Septic Installation · Septic System Repair
Septic Installation · Septic System Repair
Septic Installation · Septic System Repair
Septic Installation · Septic System Repair
Septic Installation · Septic System Repair
Septic Installation · Septic System Repair
Septic Installation · Septic System Repair
The USDA has already rated this ground for exactly one use: a septic tank absorption field. Within 4 miles of Normandy — 32,008 acres across 103 soil map units — it rates 73.5% of the land very limited for that use and 16.4% somewhat limited, and almost none with no limitation at all.
A rating on its own tells you nothing you can act on. The reasons do, and around Normandy the leading one is depth to bedrock on 47.2% of the mapped area, followed by slope on 44.9%. In full:
| Limiting feature | Share of area | What it means on site |
|---|---|---|
| Depth to bedrock | 47.2% | Bedrock is too shallow to fit a trench above it |
| Slope | 44.9% | The ground is too steep for a conventional field |
| Slow water movement | 37% | Water moves through the soil too slowly for a drain field to keep up |
| Seepage, bottom layer | 31.4% | The layer beneath the trench is porous enough that effluent could reach groundwater without being filtered |
| Depth to saturated zone | 11.7% | A seasonal water table sits too close to the surface |
Shares overlap: most soils here are limited for more than one reason at once, so these do not sum to 89.9%.
The named soils and land types that make up most of the ground around Normandy. Hawthorne alone accounts for 19.8% of it.
| Soil or land type | Share | Drainage | Slope | Depth to bedrock | Septic rating |
|---|---|---|---|---|---|
| Hawthorne | 19.8% | Somewhat excessively drained | 5 to 60% | 26 in | Very limited |
| Dellrose | 13.7% | Well drained | 5 to 60% | None in profile | Very limited |
| Mimosa | 11% | Well drained | 2 to 75% | 55 in | Very limited |
| Mountview | 8% | Moderately well drained | 2 to 20% | None in profile | Somewhat limited |
| Harpeth | 5% | Well drained | 0 to 12% | None in profile | Somewhat limited |
“None in profile” means SSURGO records no bedrock or other restrictive layer within the depth it describes, not that none exists.
This is limestone country, and around Normandy the rock is close enough to the surface to be the governing constraint. A drain field is a shallow excavation: the trench has to sit in natural soil, with room beneath it for effluent to move down and be treated. Rock under the trench does not treat anything, and it cannot be solved by digging deeper or by blasting — breaking rock produces a hole, not a soil profile. What a shallow site usually means in practice is a shallow-placement or low-pressure pipe design, imported fill, or a field sited well away from the house on whatever part of the lot runs deepest — which is why a soil map is worth having before you decide where the house goes.
A drain field has to be close to level. Effluent is distributed along a trench by gravity or by pump, and on a grade it runs to the low end, overloads it, and surfaces there. Around Normandy enough of the ground is steep that field placement tends to decide house placement rather than the other way round — the usable field area is often a bench or a shoulder some distance from the best building site, and the connection between them is a cost. It is worth knowing which part of a lot is the field before you fall in love with a view.
The ground around Normandy holds water. Tennessee measures this as an absorption rate in minutes per inch, and slow soil does not fail a site so much as enlarge it: the slower the rate, the more trench length the same household needs, and past a point a conventional field stops being approvable at all. A slow site is normally still buildable on a low-pressure pipe or drip design, and that is the point at which the installer list matters, because most licence holders in Tennessee are not endorsed for either.
Area of interest: a 4-mile radius around the USGS Geographic Names centre point for Normandy (GNIS 1295828, 35.4520, -86.2600), chosen because five of this state's communities are unincorporated and have no boundary to use, and because the lots that need a septic permit are in the ring around a town rather than inside it. Soil from USDA-NRCS Soil Data Access, SSURGO interpretation “ENG - Septic Tank Absorption Fields”, area-weighted by mapped acreage and by each component's share of its map unit. Survey areas: . Retrieved 2026-09-09.
This is a survey, not a soil map for your lot. A permit needs a high-intensity map of the specific parcel, produced by a TDEC-approved soil consultant — see soil map vs perc test.
Septic permitting in Bedford County is administered by the State of Tennessee, not the county health department. See the Bedford County detail →